Off Veera Desai Road, Andheri West Mumbai, Maharashtra 400053
Fees
Published, because you will ask anyway
Three finish bands, quoted per square foot of carpet area. What moves the number is how much civil work the flat needs and how much of the joinery is bespoke — not how nice your building is.
Bands
3
Range
₹1,600–4,500/sq ft
Design fee
Fixed, not a percentage
Quoted in
Carpet area
01
Essential
A complete home, specified honestly, with nothing hidden in the finish.
₹1,600–2,200
per sq ft of carpet area, excluding GST
Branded laminates, factory-finished ply, standard hardware with a written warranty.
A 900 sq ft flat: ₹14,40,000 – ₹19,80,000
Included
Full design — layouts, elevations, 3D views for every room
Modular kitchen and all wardrobes
Electrical and lighting layout, plus false ceiling where needed
Every band assumes the flat is handed to us empty and structurally sound. Civil work beyond minor demolition, plumbing relocation and society charges are quoted separately, in writing, before they start.
Rough it out
What would your flat actually cost?
Move the slider and pick a finish level. This is the range we would open a conversation at — not a quote, and not binding on either of us.
3004,000 sq ft
Indicative range, excluding GST
—to—
Joinery & carpentry42%—
Civil & finishes20%—
Electrical & lighting15%—
Loose furniture15%—
Design fee8%—
A range, not a quote. The real number moves with the state of the flat, how much civil work it needs, and what you already own.
A rough breakdown of a typical turnkey budget. Useful before you talk to anyone — including us. If a quote you are holding puts joinery at seventy percent, you now know what to ask about.
0%Joinery & carpentryWardrobes, kitchen, storage walls, all built-ins. Always the largest line.
What does a full home interior actually cost in Mumbai?
Between ₹1,600 and ₹4,500 per square foot of carpet area, depending on finish level. For a 900 sq ft 2 BHK that is roughly ₹15 to ₹40 lakh all-in. Anyone quoting well below that band is either excluding something or intending to.
How is your fee calculated?
A fixed fee, agreed before any drawing starts, based on carpet area and scope. It does not move if your budget moves. We deliberately avoid the percentage model — it pays us more when your project costs more, which is the wrong incentive.
What does the payment schedule look like?
Typically five stages: booking, on approval of drawings, at material procurement, at 70% site completion, and on handover after the snag list is closed. The final stage is never a token amount — it has to be worth us coming back for.